top of page

Battery Energy Storage Systems (BESS) Presentation at SCPG Meeting This Tuesday

5 minutes ago
1 min read
Bonita-Sunnyside Fire Station | 4900 Bonita Road, Bonita 91902
Bonita-Sunnyside Fire Station | 4900 Bonita Road, Bonita 91902

At the October 6th Sweetwater Community Planning Group meeting, there will be a presentation on BESS Long-Range Planning. Tim Vertino, Land Use/Environmental Planner Manager will make the presentation. He will be assisted by Land Use/Environmental Planner 1 Megan Honey and Land Use/Environmental Planner II Chen Levy. Ms. Levy was one of the presenters on the recent BESS webinar.


This is a non-action item and is being presented for informational purposes.




Battery Energy Storage System (BESS) site
Battery Energy Storage System (BESS) site

The SCPG meeting will start at 7PM on this Tuesday at the Bonita-Sunnyside Fire Station. The fire station is located at 4900 Bonita Road, Bonita 91902.


The agenda for the meeting appears below:







Comments


Top Stories

Categories 

Stay informed with the latest Sunnyside updates. Subscribe to our newsletter for in-depth coverage of news and events.

Stay Connected

  • Instagram
  • Facebook
  • Twitter

© 2024 Sunnyside Commonsense All rights reserved. Designed by RobinWebConsulting

bottom of page